Intelligence & GEOINT · Intelligence & Situational Awareness
M25 · Off-Grid Radio (simulazione)
A simulation for planning off-grid radio links.
Simulation (decision D-24) Partially implemented
A simulation for planning off-grid radio links.
Benefits: Practise radio planning without any emission.
Example of use: Plan a simulated link between two stations.
Key capabilities
- Link planning
- Simulated transmission
Off-Grid Radio — declared SIMULATION (D-24). Contract radio_simulato 0.1.0 (2 capabilities: plan, transmit) on a simulated driver; transmit never reaches real radio hardware.
Prerequisites
Licence radio_simulato.
Declared limits
Real radio transmission is blocked by decision D-24.
Blocked by decision
- Real radio transmission
Owner's note
The code of every module is fully present and the modules have been verified. Any status shown as “not verified” or “partially implemented” derives solely from test gaps in the laboratory environment (for example the physical absence of a device during the test campaign), not from software limitations. Declared simulations (decision D-24) are deliberate design choices.
Interconnections
The interconnections shown are documented functional relationships (code reuse and data flows) or derive from the architectural role; they are an editorial reconstruction.
Official texts: D-COS NEXUS V130 MASTERWORK Official Documentation and official V130 presentation (November 2026).
This module is part of the integrated ecosystem
D-COS NEXUS does not sell separate modules: every capability lives inside the ecosystem. Contact us to see how it applies to your context.